Content block block-1563504775-1781409921 Body September 12, 2017 Board of Supervisors Meeting Notice of Public Hearing Cielo Vista Project Alternative 5 Area Plan August 9, 2017 Subdivision Committee Special Meeting Public Notice VTTM 17341 Staff Report, Map and Supporting Documents OCFA Conceptual Fire Master Plan OCFA Conceptual Fuel Modification Plan Notice of Public Hearing - Deleted Item Power Point Presentation Cielo Vista Project Area Plan Final EIR Notice of Availability Cielo Vista - Notice of Preparation Cielo Vista - Second (2nd) Revised Public Notice of Availability (NOA) DEIR 615 Cielo Vista Draft EIR 615 Table of Contents Executive Summary 1.0 Introduction Draft 2.0 Project Description 3.0 Basis for Cumulative Analysis 4.1 Aesthetics 4.2 Air Quality 4.3 Biological Resources 4.4 Cultural Resources 4.5 Geology and Soils 4.6 GHGs 4.7 Hazards and Hazardous Materials 4.8 Hydrology and Water Quality 4.9 Land Use and Planning 4.10 Noise 4.11 Population and Housing 4.12 Public Services 4.13 Recreation 4.14 Traffic - Transportation 4.15 Utilities and Service Systems 5.0 Alternatives 6.0 Other Mandatory CEQA Considerations 7.0 List of Preparers Cielo Vista Draft EIR 615 Appendices Appendix A: NOP/NOP Comment Letters Appendix B: Air Quality Study Appendix C: Biological Resources Assessment Appendix D: Cultural Resources Assessment Appendix E: Geology Study Appendix F: Greenhouse Gas Study Appendix G: Hazardous Materials Assessment Appendix H: Conceptual Water Quality Management Plan/Hydrology Analysis Appendix I: Noise Study Appendix J: Public Service and Utility Correspondence Appendix K: Sewer Study Appendix L: Traffic Study Cielo Vista DEIR 615 Response to Comments Draft EIR Public Notices of Availability Cielo Vista EIR - Responses to Comments - complete Cielo Vista EIR - Responses to Comments - Appendices complete 0.0 Table of Contents 1.0 Introduction 2.0 Comments and Responses 2.A Topical Responses 2.B Responses to Individual Comments - Batch 1 (Agency Responses) 2.B Responses to Individual Comments - Batch 2 (City Responses) 2.B Responses to Individual Comments - Batch 3 (Organization Responses) 2.B Responses to Individual Comments - Batch 4 (Individual Responses) 2.C Public Hearing Comments and Responses 3.0 Corrections and Additions 4.0 Mitigation Monitoring and Reporting Program (MMRP) Appendix A – Original Comment Letters/Correspondence Appendix B-1 – Supplemental Geotechnical Report – Location of Whittier Fault Appendix B-2 – Supplemental Geotechnical Report - Discussion of Potential Implications of Subsurface Geological Features Appendix B-3 – Measured Ambient Noise Levels Appendix C – Fire Behavior Analysis Report Appendix D-1 – Conceptual Drainage Study Appendix D-2 – Conceptual Water Quality Management Plan Links in this section relate to Body